Life as an Engineer
We have been pretty busy at work and hardly have been on site. We are supposed to get back out to Buckley AFB next week to resume rotomilling the mainline of the other taxiway and also will be paving the other taxiway. Our job out in Broomfield in controlled chaos. We have had a lot of extra work out there which is always good because we can charge out time and materials. There are so many subcontractors on that job that our new concrete gets damaged often. It would be wise if they had us hold off until the end to replace it, but they don't. Some spots have been removed and replaced 4 times. It is money for us but would be easier if they just left it until the subcontractor traffic died down some.